UNIFI Communications

SOLUTIONS

We own. We build. We repurpose. We run.

Explore our solutions

This is what we have done for 25 years. We own cables. We build with Genesis, protect with Pulse, repurpose existing cables with Relight and run with Cortex.

Crew handling subsea cable on a vessel deck

THE LIFE OF A CABLE. GENESIS, PULSE, RELIGHT, CORTEX

Genesis

New cables, built turnkey

We design, build and deliver a new subsea system, end to end.

Offer details
You get
Survey, permits, cable, landing stations and handover, under one contract
Proof
Ebla (UGARIT 2), 240 km and 24 fibre pairs, designed for 370 Tbps
How to buy
Turnkey contract, with maintenance after handover. We can also co invest
Delivered by
UNIFI as prime contractor, with trusted vendors following clean network principles

Pulse

Cable maintenance after installation

A new alternative for cable maintenance in the Mediterranean.

Offer details
You get
Care after handover. Monitoring, fault location, repair at sea, spares and landing station upkeep
Why us
We own and manage cables ourselves, so we know what an owner needs
How to buy
A private maintenance agreement shaped to your cable, on its own or with a turnkey build
Delivered by
UNIFI with trusted marine partners

Relight

New life for existing cables

More capacity and more years from a system you already own.

Offer details
You get
New equipment at the landing stations, on the cable already in the water
Proof
UGARIT 1, taken from 622 Mbps to 6 Tbps, and IG 1, taken to 400G technology
How to buy
Upgrade contract, a fraction of the cost and time of a new cable
Delivered by
UNIFI with trusted vendors following clean network principles

Cortex

Cable operations and management

We run your subsea system for you, year after year.

Offer details
You get
Operations, maintenance coordination, capacity sales and reporting
Proof
MedCable, 1,300 km between France and Algeria, managed for 20 years through WIS Telecom
How to buy
Management contract
Delivered by
UNIFI and its group companies

CAPACITY AND ROUTES

Photon

Capacity on our systems

International capacity on cables we own.

Offer details
You get
Capacity or a fibre pair, with landing and onward connection
Proof
IG 1 between Italy and Greece, operating today
How to buy
Capacity lease or fibre pair
Delivered by
UNIFI and its group companies

Ai Corridor

Integrated Ai corridors

Power, site, route and compute planned as one.

Offer details
You get
One feasibility study and one delivery plan for the whole chain
Scale
From a single campus to a cross border corridor
How to buy
Feasibility first, then a single delivery contract
Delivered by
UNIFI with iNEW and UNIFI Developers

The proof

Ebla (UGARIT 2). A new turnkey subsea systemIn development
240 km and 24 fibre pairs between Cyprus and Syria, designed for 370 Tbps. We build it end to end and we are part owner alongside Cyta and Syrian Telecom.
UGARIT 1. An existing cable, renewedDelivered
We upgraded a 239 km system in service since 1995, from 622 Mbps to 6 Tbps.
IG 1, Italy to GreeceOperating today
UNIFI operates and has upgraded this subsea system, which it owns through WIS Telecom.
MedCable. 20 years of cable managementTrack record
A 1,300 km system between France and Algeria, managed through WIS Telecom.
International carrier networkOperating today
Licensed by the FCC since 2004. 450+ carrier connections in more than 70 countries.

COMING NEXT

In development

Zenith

Compute and Ai corridors by satellite.

Some places cannot wait for a cable. Zenith brings compute and an Ai corridor from the sky, to sites far from the coast and far from the grid.

By sea
Genesis and Relight
By land
Terralink
By sky
Zenith, with a leading satellite partner
Concept picture of a remote site under a night sky

WORKED EXAMPLES

Four cables. Built, renewed and managed.

Ebla (UGARIT 2)

Project details
CYPRUSSYRIALEBANONTÜRKIYE Mediterranean Sea PentaskhinosTartous UGARIT 2 240 km 100 km

A new cable. The planned route, indicative, drawn from the public announcement.

The need
A new high capacity cable between Cyprus and Syria
Our role
Turnkey build, end to end. We are also part owner
Partners
Co owners Cyta and Syrian Telecom
The numbers
240 km, 24 fibre pairs. 31 Tbps at launch, 370 Tbps by design
Timing
Agreement signed 28 July 2026 and announced 11 August 2026. Service targeted for mid 2028, subject to project conditions
Why it matters
The first major international infrastructure deal of post sanctions Syria

IG 1

Project details
ITALYGREECE Ionian Sea IG 1 100 km

An owned cable, renewed. The route between Italy and Greece, indicative.

The need
More capacity between Italy and Greece
Our role
Owned through WIS Telecom and operated by UNIFI
Partners
Upgrade delivered with Retelit
The numbers
About 170 km under the sea. Upgraded with 400G technology, up to 40 Terabit
Timing
Built 1995. Upgrade in service since July 2022

UGARIT 1

Project details

New life for a cable in service since 1995.

The need
More capacity on an existing cable, without waiting for a new one
Our role
We delivered the upgrade
Partners
The cable owners, Syrian Telecom and Cyta
The numbers
239 km. From 622 Mbps when built to 6 Tbps after the upgrade
Timing
Built 1995. New equipment delivered 2025

MedCable

Project details

20 years of managing a subsea cable for its owners.

The need
An experienced team to run the system day to day
Our role
Cable management, through WIS Telecom
Partners
Owned by the Orascom Telecom group
The numbers
1,300 km. Marseille to Algiers and Annaba
Timing
In service since 2005. Managed for 20 years, then handed over in good order

WAYS TO WORK WITH US

Four clear commercial models.

Buy capacity
Lease capacity or a fibre pair on a system we own. | Best for hyperscalers and carriers
Co invest
Take a share in a new system alongside us. | Best for carriers and investors
Build, maintain and operate
We build it for you, then maintain and run it under contract. | Best for governments and national operators
Renew and manage
We upgrade and run what you already own. | Best for cable, data center and network owners

Tell us the two ends you need to connect, or the site you need to power.