Subsea cables for Ai data centers.

Ai campuses are measured in gigawatts. The cables that connect them are measured in terabits. This guide explains what an Ai cluster needs from international capacity, and how to plan for it.

By the UNIFI network team. 5 minute read.

Crew bringing a cable ashore through the surf

THE SHORT ANSWER

Plan the cable with the campus. An Ai site with one route out is a stranded asset.

25 to 50
terabits a second of data per gigawatt of Ai compute, by one industry estimate
Every 3 years
international bandwidth demand is forecast to double
24 pairs
of fibre in a modern regional system such as Ebla (UGARIT 2)

Illustrative. Estimates as reported by RCR Wireless, January 2026, and TeleGeography, June 2026. Source links are in the legal disclaimer at the foot of this page.

Why Ai changes the sum

Training happens inside the campus. Everything else travels. Data arrives from other regions. Models are copied to other sites. Users send requests from far away and expect fast answers.

Ai is still a small part of international traffic today. The campuses now being built are what change that.

What an Ai cluster needs from a cable

  • Capacity in large blocks. Whole fibre pairs or large wavelengths, with room to grow.
  • More than one way out. Routes that do not share the same landing or the same water.
  • Low delay for users. The shorter the path to the customer, the faster the answer.
  • A landing near the site. Long land links to the coast add cost and risk.
  • Rights that last. Capacity secured for many years, to match the life of the campus.

When to start

Before the power agreement is signed. A new cable takes years. An upgrade of an existing cable takes months. Both must be decided early enough to be ready when the first hall opens.

SIDE BY SIDE

Leasing and owning compared.

Lease capacityOwn a fibre pair or co invest
SpeedFast, if capacity existsSlower. You join or start a build
ControlThe carrier decides upgradesYou decide upgrades on your pair
Cost over timeHigher per unit as you growLower per unit at large scale
CommitmentShorterLong term
Best forThe first years of a campusLarge campuses with steady growth

IN PRACTICE

We sell capacity, and we build for those who need more.

UNIFI owns IG 1 between Italy and Greece, renewed with 400G technology. We are building Ebla (UGARIT 2), with 24 fibre pairs and 370 Tbps by design.

A campus owner can lease capacity, take a fibre pair, or co invest in a new system alongside us.

BEFORE YOU DECIDE

Five questions for your network plan.

  • How many terabits will the campus need in year one, and in year ten?
  • How many separate routes leave the site?
  • Where do those routes land, and who owns the landing?
  • Will you lease, own a fibre pair, or co invest?
  • Who maintains the cable, and how fast is a repair?

Ask these before the site is final. Afterwards the answers cost more.

COMMON QUESTIONS

Short answers.

Do Ai data centers need subsea cables?

Yes, when their users or their data are in another country or across a sea. Most large campuses serve more than one market.

How much capacity does an Ai campus need?

Estimates suggest 25 to 50 terabits a second for each gigawatt. Real needs depend on the work the campus does.

Can existing cables carry Ai traffic?

Often yes, especially after an upgrade. Very large campuses usually need new capacity as well.

What is a fibre pair?

Two strands of glass, one for each direction. Owning a pair gives you control over how much capacity it carries.