One gigawatt of Ai is estimated to move 25 to 50 terabits a second of data.

103 GW
global data center capacity baseline, per JLL
200 GW
forecast for 2030, about double
Every 3 years
international bandwidth demand is forecast to double

Illustrative. Power figures from JLL Global Data Center Outlook, January 2026. Bandwidth figures from TeleGeography, 2026. The 25 to 50 terabit estimate as reported by RCR Wireless, January 2026. Source links are in the legal disclaimer at the foot of this page.

Two curves on the same clock

Power is doubling, and bandwidth has to keep up. If one falls behind, the other is stranded.

Investors study the power side closely. The network side receives less attention, and it takes just as long to build.

The rule of thumb

Multiply the gigawatts by 25 to 50. That gives a rough figure, in terabits a second, for the data a campus may move.

It is an estimate, not a law. A campus that trains models needs less than one that serves millions of users. It is still the right starting point for a plan.

What it means for an investor

  • Check the routes with the same care as the power. A site with a signed power agreement and a single cable is exposed.
  • Value the diversity. Two routes that do not share a chokepoint are worth more than two that do.
  • Look at who owns the path. Owned or long term capacity protects the return better than short leases.

SIDE BY SIDE

Campus size and the capacity it implies.

Capacity it may needPut in context
1 GW campus25 to 50 terabits a secondAbout 2% of all international internet bandwidth in 2026
2 GW cluster50 to 100 terabits a secondAbout 4%
5 GW campus125 to 250 terabits a secondAbout 11%

IN PRACTICE

We plan the terabits with the gigawatts.

UNIFI confirms the fibre and subsea paths before the power agreement is signed. We build more than one way out, and we connect new compute regions to the markets that buy from them.

The percentages in the table are measured at the top of each range, against international internet bandwidth of 2,259 terabits a second.

BEFORE YOU DECIDE

Five checks before you invest in a campus.

  • How many gigawatts are secured, and by when?
  • How many terabits does that imply?
  • How many separate routes carry them?
  • Who owns those routes, and for how long?
  • What happens to revenue if one route fails for three months?

If the fifth answer is unclear, the network plan is not finished.

COMMON QUESTIONS

Short answers.

How much bandwidth does one gigawatt of Ai need?

One industry estimate is 25 to 50 terabits a second of data.

Why does connectivity matter to investors?

Because compute earns nothing until it reaches customers. A weak route puts the whole return at risk.

Is Ai already most of the traffic?

No. It is still a small part. The campuses being built now are expected to change that.

What is a stranded asset in this context?

A finished campus that cannot deliver its service because power or routes are missing or cut.

Assessing a campus? Ask us to review the routes.